Alstom to build new battery-electric train fleet
Alstom will build the UK's first battery-electric trains for long-distance routes, creating over 350 jobs at its Derby factory and supporting thousands more in the supply chain.
Intelligence analysis by Gemini 2.5 Flash Lite

The UK government has announced a significant investment in Alstom to manufacture a new fleet of 29 battery-electric trains. These trains, destined for TransPennine Express services, will enter service in 2034 and are expected to improve journey times, reduce emissions on non-electrified lines, and boost employment in Derby and the wider supply chain.
Imagine trains that can run on electricity like a phone, but without needing wires all the way. These new trains will use batteries to travel on parts of the track that don't have electric wires yet, making the air cleaner and journeys faster. It's like giving the trains a superpower to go anywhere without pollution!
Analysis
Alstom's Litchurch Lane Factory
The Litchurch Lane factory in Derby, a site with a rich railway heritage dating back to 1876, is set to become the hub for the UK's first main line battery-electric trains. This contract is a significant boost for the facility, which recently faced redundancy consultations that put 1,300 jobs at risk. Alstom, already a major player with the largest rolling stock manufacturing site outside China, has secured a substantial order that will not only safeguard but also create jobs. The investment of nearly £1 billion is projected to support over 350 jobs directly at the factory and an additional 6,000 jobs across the UK supply chain. This includes 40 new apprenticeships, highlighting a commitment to developing future talent in the rail manufacturing sector.
TransPennine Route Upgrade
The new Adessia Stream trains are integral to the TransPennine Route Upgrade's objective of increasing capacity by 30%. This upgrade aims to provide thousands of additional seats daily across the Pennines by the mid-2030s. The battery-electric trains will operate on key routes connecting major northern cities, including Liverpool, Scarborough, Manchester, and Hull. A key feature of these trains is their ability to run without emissions on sections of the railway that are not yet electrified, currently reliant on diesel engines. This transition is expected to significantly reduce the environmental impact of rail travel in the region. Furthermore, the new fleet is anticipated to cut journey times, with reductions of up to 10 minutes between Manchester and Leeds, and up to 14 minutes between Manchester and York, enhancing the overall passenger experience.
Economic and Environmental Impact
The investment in this new train fleet is framed as a dual benefit for the UK economy and its environmental goals. Prime Minister Andy Burnham highlighted the potential for faster, more reliable journeys and the creation of thousands of jobs for future generations, addressing past frustrations with delayed or cancelled train services. Transport Secretary Heidi Alexander emphasized that this project supports the country's need for modern infrastructure while securing high-skilled jobs in economic heartlands like Derby. The trains themselves are designed to offer a superior passenger experience, featuring quieter and smoother rides, improved accessibility with step-free boarding, ample luggage space, onboard Wi-Fi, dedicated wheelchair spaces, and family-friendly areas. This initiative underscores a commitment to both advanced manufacturing and sustainable transport solutions.
Key points
- Alstom will build 29 new battery-electric trains for TransPennine Express services.
- The trains are set to enter service in 2034 and will be built at Alstom's factory in Derby.
- The investment of nearly £1bn will support over 350 jobs at Alstom and 6,000 in the UK supply chain.
- The new fleet aims to boost capacity, reduce emissions on non-electrified lines, and cut journey times.
- Features include step-free boarding, improved accessibility, and enhanced passenger amenities.
The successful deployment of these battery-electric trains could accelerate the decarbonization of the UK's rail network, setting a precedent for future long-distance train manufacturing. This project is expected to bolster domestic engineering capabilities, create a significant number of skilled jobs, and improve passenger experience with faster and more reliable services.
Potential challenges include delays in the manufacturing process, cost overruns, or unforeseen technical issues with the new battery technology on main lines. The success of the TransPennine Route Upgrade and the full realization of journey time savings are also dependent on the completion of associated infrastructure works.



